1.439MW Solar Installation

  • System size 1.439MW
  • Location Altona, Victoria
  • Solar Panels Risen 450w Half Cell Solar Panels
  • Inverter Sungrow 110Kw
  • Solar production p.a. 1740MWh

ETEX has awarded the first of its 7 sites to Kuga Electrical. Through diligent site visits ensuring electrical compliance are met and site specific constraints, Kuga Electrical has developed a solution based solar system that will cover 34% of the entire site energy needs and contribute to Etex’s sustainability targets. Kuga installs a 1.439MW solar PV system by delivering 1,734GWh of energy per year.

1.022MW Solar Installation

  • System size 1.022MW
  • Location Murrarie, QLD
  • Solar Panels Risen 450w Half Cell Solar Panels
  • Inverter Sungrow 110Kw

KUGA installed 1.022MW of solar capacity at the Americold facility, representing the client’s largest installation in Australia. They overcame challenges with heavy insulating panels and collaborated with structural engineers to ensure structural integrity. The unique panel layout constraints and updated wind standards in Queensland were successfully managed.

1.2MW Solar Installation

  • System size 1.2MW
  • Location South Melbourne, Victoria
  • Solar Panels 450W Trina Tallmax Solar Panels
  • Inverter Sungrow
  • Solar production p.a. 1408MWh

KUGA Electrical was selected as the successful EPC partner for a 1.2MW solar installation in May 2022. In addition to reputation and quality, the key selection factor was turnaround time. The client needed a supplier with the capability to install by the end of the financial year. The turnaround from the initial site inspection through to practical completion was 10 weeks.

845kW Solar Installation

  • System size 845kW
  • Location Victoria & NSW
  • Solar Panels 370W Hanwa Q Cell PV modules
  • Inverter Huawei
  • Average daily production p.a. 657.09 Kwh/day

Heritage care is a leading, privately-owned aged care facility network. To reduce overheads across their portfolio, they engaged KUGA Electrical to install solar power on six of their sites across Victoria and New South Wales. Ultimately, 845kW of solar power was installed across the six facilities. The panels selected were the smaller 60-cell 370W Hanwa Q Cell PV modules.

730kW Solar Installation

  • System size 730kW
  • Location Pendle Hill,NSW
  • Solar Panels Astro 4 SEMI 450W 
  • Inverter Sungrow 110Kw 3P
  • Solar Production p.a. 767.7MWh

Our latest industrial solar installation for Cromford Film in Pendle Hill, NSW. For this project, Kuga used tier-1 solar panels from Astronergy, rated for their high reliability compared to other tier-1 options on the market. Coming with a 25-year warranty, Astronergy panels provide great value for money and peace of mind. Kuga Electrical partners with suppliers like Astronergy to deliver the best possible solar solutions for our customers. See how you can benefit from market-leading solar tech with a commercial solar installation by our team.

525kW Solar Installation

  • System size 525kW
  • Location Campbellfield, Melbourne
  • Solar Panels 310W JA Solar Mono Perc
  • Inverter Goodwe
  • Solar production p.a. 1264.11MWh

They are a renowned fresh food Manufacturer and Exporters. It has a state of art production facilities comprising cold storage and chilling units for food storage facilities with 24 x 7 service operations. KUGAs solar installation at Della Rosa received the “Energy efficiency Project of the year” Master Electricians award for 2019.

500kW Solar Installation

  • System size 500kW
  • Location Blacktown, NSW
  • Solar Panels 450W Trina Tallmax Solar Panels
  • Inverter Sungrow
  • Solar production p.a. 656.2MWh

Charter Hall is well known Australian based property investment management company. Kuga Australia won this Charter Hall Holdings Pty Ltd – QLS Logistics project for building 500kW Solar PV System in Blacktown, NSW through Hansen Yunken (Builder). Kuga successfully completed the project despite facing heavy rains and damp site conditions during the installation.

330kW Solar Installation

  • System size 330kW
  • Location Horsley Park, NSW
  • Solar Panels 480W SunPower SPR-P3-480 UPP
  • Inverter SMA STP Core 2
  • Solar production p.a. 494.74MWh

ESR is APAC’s largest real asset manager and 3rd largest listed real estate Investment Manager globally. ESR aspires to operate sustainability and is built by Hansen Yunken through the tender process. KUGA won this project by completing Solar PV for Lot 201 and 202 for 4 tenancies for 330kW. As per ESR’s design brief KUGA installed Solar PV with 25 Year Warranty Sunpower panels.

330kW Solar Installation

  • System size 300kW
  • Location Kings Park, NSW
  • Solar Panels 310W JA Solar
  • Inverter 4 x 60kW Goodwe
  • Solar production p.a. 397.364 MWh

Our Maxton Fox solar installation recently received an excellence award for “Energy Efficiency project of the year 2019” from the Master Electricians Association. This installation included a 970 x 310W JA Solar panels, together with 4 x 60 kW Goodwe Inverters.

239kW Solar Installation

  • System size 239kW
  • Location Campbellfield, Melbourne
  • Solar Panels 315W JA Solar Half Cell
  • Inverter 5x 50kW Goodwe
  • Solar production p.a. 308.508 MWh

Kuga Electrical installed a 239kW solar system for Altimate Foods located in Campbellfield Melbourne. The solar system had 758 x JA Solar Panels with 5 x 50kW Goodwe Inverters. Our solar installation will produce about 39% of the total electricity needs for Altimate Foods.

200kW Solar Installation

  • System size 200kW
  • Location Concord, New South Wales
  • Solar Panels Jinko 440W mono facial
  • Inverter SolarEdge inverters, along with DC optimisers.
  • Solar Production p.a. 258.4MWh

As part of the redevelopment of Concord Oval, Kuga has successfully completed 2 x 100 kW of solar PV installations at two significant recreation spaces in the Concord LGA, called Concord Oval and St Luke’s Park South, to serve council and West Tiger’s tenancy individually. Kuga won this project through ADCO Constructions, the builder of choice for the redevelopment of Concord Oval in Sydney’s Inner West.

200kW Solar Installation

  • System size 200kW
  • Location South Wharf, Melbourne
  • Solar Panels 450W Trina
  • Inverter 2 x 110W Sungrow
  • Solar Production p.a. 232MWh

KUGA Electrical worked with the managing agent CBRE to install 200kW of solar on the carpark roof of the DFO. This install involved connecting two 99kW systems into different sub-boards, each with a seperate connection to the grid. This allowed the KUGA certificate processing team to make two seperate STC claims, reducing the investment for the client significantly.

200kW Solar Installation

  • System size 200kW
  • Location Concord, New South Wales
  • Solar Panels Jinko 440W mono facial
  • Inverter SolarEdge inverters, along with DC optimisers.
  • Solar Production p.a. 258.4MWh

As part of the redevelopment of Concord Oval, Kuga has successfully completed 2 x 100 kW of solar PV installations at two significant recreation spaces in the Concord LGA, called Concord Oval and St Luke’s Park South, to serve council and West Tiger’s tenancy individually. Kuga won this project through ADCO Constructions, the builder of choice for the redevelopment of Concord Oval in Sydney’s Inner West.

200kW Solar Installation

  • System size 200kW
  • Location Hallam, Melbourne
  • Solar Panels Polycrystalline
  • Inverter 2 x 50kW Goodwe
  • Solar production p.a. 455.688 MWh

Kuga Electrical installed the commercial solar system at Spa Industries. This project won the Master Electricians 2018 project of the year. All the design, engineering and installation were completed by our internal Electricians. See our video testimonial for feedback about our solar project.

100kW Solar Installation

  • System size 100kW
  • Location William St, Melbourne
  • Solar Panels 450W Trina
  • Inverter 1 x 110kVA Sungrow
  • Solar Production p.a.  110.8MWh
KUGA completed a 100kW solar install at 15 Williams Street in Melbourne CBD. Being a 22-story building, getting almost 6 tonnes of solar panels to the roof required effective project management. The wind loads at that height necessitated special considerations around the rail to secure the PV panels to the roof. Overall, the system contributed to the green credentials of the base building – an essential metric.

100kW Solar Installation

  • System size 100kW
  • Location Corrimal, NSW
  • Solar Panels Risen 450w Solar Panels
  • Inverter 4 x 25Kw Fronius Eco
  • Solar Production p.a 126.531MWh
Corrimal High School is a government-funded co-educational comprehensive secondary day school.  Corrimal High School was recently rebuilt and upgraded By Loyld Constructions. This tender was released for numerous companies and KUGA won this project for building 100kW solar PV on the new block G and successfully completed the project as per the given timelines and complying to the NSW Department of Education’s specifications.

100kW Solar Installation

  • System size 100kW
  • Location Cow Flat, NSW
  • Solar Panels 400W Longi Solar Bifacial
  • Inverter 1 x 110kVA Sungrow
  • Solar Production p.a  162.4MWh
KUGA Electrical has completed an initial ground mount solar project at one of OMYAs portfolio of mineral mines. The project included the Council DA application, Civil Engineering, underground trenching as well as the mechanical and electrical installation of the PV panels. The bi-facial solar panels used for this job are producing well over 10% more than the business case numbers suggest for the mono-facial panel.

100kW Solar Installation

  • System size 100kW
  • Location Laverton North, Melbourne
  • Solar Panels 440W Jinko
  • Inverter 1 x 110W Sungrow
  • Solar Production p.a.  135.02MWh
Sabco has been a repeat customer of KUGA Electrical three times and counting! Being a manufacturer involving plastics, they are very committed to recycling and reducing environmental impact across all areas of their business. At the same time, KUGA also installed a 100kW solar system which will save them 135 Megawatt-hours of electricity every single year.

100kW Solar Installation

  • System size 100kW
  • Location Dandenong, Melbourne
  • Solar Panels 310W JA Solar Mono-PERC
  • Inverter 2 x 50kW Goodwe
  • Solar production p.a. 350.618 MWh

Defries Industries opted to go with a Power Purchasing Agreement. There Power Purchase Agreement was consumption only, so they only paid for the solar power the system produced. On this project we worked around engineering challenges so what our video for more information.

100kW Solar Installation

  • System size 100kW
  • Location Mount Druitt, Sydney
  • Solar Panels 320W JA Solar Half Cell
  • Inverter SMA Core 1
  • Solar production p.a. 143.754 MWh

Our 100kW commercial solar system has 312 x 320W JA Solar Half Cell solar panels with 2 x 50kW SMA Core 1 Inverters. This was one of Australia’s first installations with the new SMA Inverter. The solar system will have enough solar production to cater for future power needs at Arneg.

99.9kW Solar Installation

  • System size 99.9kW
  • Location Tarneit, Melbourne
  • Solar Panels 450W EGing
  • Inverter 1 x 82.8kW SolarEdge
  • Solar Production p.a.  126.67MWh
KUGA Electrical used their expertise on the specifics of school solar installs to design a 99.9kW system for St Francis of Assisi high school. The panels were connected using SolarEdge inverter technology due to their very low roof voltages and ability to cut DC power on the roof. The KUGA team also introduced solar schools software to the college.

99kW Solar Installation

  • System size 99kW 
  • Location Melbourne, VIC
  • Solar Panels 333 x JA Solar 300W
  • Inverter 2 x GoodWe 50kW Inverter
  • Solar production p.a. 294.284MWh

The owner of eight bowling centres explains how her electricity bills were halved through the install of solar energy on each centre. Oz Ten Pin Bowling centre saves nearly 50% off their first bill after the solar installation. This type of savings makes a tremendous effect on our business.

LED Lighting Upgrade – Stillwell Trucks

 

  • Location Milperra, NSW
  • Electricity savings p.a. $46,690
  • Lights upgrades 109 LED Highbays
    36 LED Flood Lights

    195 LED Panel Lights

Stillwell trucks are a leading truck dealership located in Millperra, Sydney NSW. To improve lighting performance and cost efficiency, Stillwell choose Kuga Electrical to upgrade their dealership and maintenance area with Led Lighting

LED Lighting Upgrade - De Bortoli Wines

  • Location Glendenning, NSW
  • Electricity savings p.a. $36,244
  • Lights upgrades 91 LED Highbays
    100 LED Panel Lights

Kuga Electrical completed a commercial LED lighting upgrade for De Bortoli Wines, Glendenning Warehouse. Business overheads increase year on year, they are often fueled by rising costs of electricity. We help businesses become more energy efficient, upgrade to LED lighting, install solar power, and battery storage.

LED Lighting Upgrade - Collingwood FC

  • Location Melbourne, VIC
  • Annual saving $16,938
  • Lights upgrades 419 LED Panel Lights
    15 LED Highbays
    91 LED Round Shopfitters

As proud partner and supporter of the Collingwood Football Club, Kuga Electrical has the great opportunity to provide energy efficiency upgrade for Collingwood FC.

LED Lighting Upgrade - Patterson Cheney Toyota

  • Location 10 sites across VIC
  • Electricity savings p.a. $8,797 (Waverley upgrade)
  • Lights upgrades 36 LED Highbays
    18 LED Canopy lights
    (Waverley upgrade)

Patterson Cheney Toyota is one of the oldest Toyota Dealerships in Melbourne. They have been around for over 30 years with branches in 21 suburbs. Kuga Electrical brought down their lighting costs by 72% and provided a great ROI.

LED Lighting Upgrade – Electrolux

  • Location Heatherton, Vic
  • Electricity savings p.a. $38,220
  • Lights upgrades 105 LED Highbays

Electrolux warehousing facility was upgraded by Kuga Electrical using our high performing LED Highbays to create substantial saving annually. We replaced 400W highbays to 150W LED highbays.

Licence numbers:

VIC REC 27103

NSW REC 318148C

QLD REC 88831

TAS REC 784865990

ACT REC 20211556

Privacy policy | Copyright © Kuga Electrical 2023.

All rights reserved. ABN 39 616 409 584

TALK TO OUR EXPERTS

logo Get Quote logo Call Now