SOLAR CONSTRUCTION PROJECTS
Case Study
330kW Solar Construction,
Horsley Park NSW
The Brief
ESR, the largest real asset manager in the Asia-Pacific region and the third-largest listed real estate investment manager globally is committed to sustainability. ESR then undertook a significant project in collaboration with Hansen Yuncken. They sought to integrate clean energy solutions with their business, and through a competitive tender process, KUGA was awarded the prestigious project to install solar PV, covering four tenancies, with a total capacity of 330kW.
The Solution
Kuga’s completion of the Solar PV project for ESR has reduced ESR’s carbon footprint. With an annual solar generation of 494.74MWh and CO2 savings of 492.76. In line with ESR’s sustainability goals, KUGA adhered to a design brief that required the installation of Solar PV systems equipped with 25-year warranty SunPower panels—a commitment to long-term environmental and financial sustainability.
Case Study
330kW Solar Construction,
Horsley Park NSW
The Brief
ESR, the largest real asset manager in the Asia-Pacific region and the third-largest listed real estate investment manager globally is committed to sustainability. ESR then undertook a significant project in collaboration with Hansen Yuncken. They sought to integrate clean energy solutions with their business, and through a competitive tender process, KUGA was awarded the prestigious project to install solar PV, covering four tenancies, with a total capacity of 330kW.
The Solution
Kuga’s completion of the Solar PV project for ESR has reduced ESR’s carbon footprint. With an annual solar generation of 494.74MWh and CO2 savings of 492.76. In line with ESR’s sustainability goals, KUGA adhered to a design brief that required the installation of Solar PV systems equipped with 25-year warranty SunPower panels—a commitment to long-term environmental and financial sustainability.
Capability Statement
Download our Capability Statement to read more on our company, our people, our capabilities and our projects.
Contact Us
Get In Touch, We Love Talking Solar!
Have an inquiry for us?
Fill out the form below to contact us!
-
VIC 4 Bridge Rd, Keysborough, 3173 Get Directions
-
NSW 6 Turbo Rd, Kings Park,2148 Get Directions
-
QLD 10 Ironstone Road, Berrinba, QLD 4117 Get Directions
-
PH 402-A.1 ICITE Bld., Eastwood, 1110 Get Directions
Industry Partnerships
4 Bridge Road, Keysborough, VIC 3173
6 Turbo Road, Kings Park, NSW 2148
31 Chetwynd St, Loganholme, QLD 4129
402-A.1 ICITE Bldg, Eastwood, 1110
COMPANY
LOCATIONS
SERVICES
QUICK LINKS
Licence numbers:
VIC REC 27103
NSW REC 318148C
QLD REC 88831
TAS REC 784865990
ACT REC 20211556
Privacy policy | Copyright © Kuga Electrical 2023.
All rights reserved. ABN 39 616 409 584