SOLAR SCHOOL PROJECTS
Case Study
100kW Solar Installation,
Corrimal NSW
The Brief
Corrimal High School, a government-funded co-educational comprehensive secondary day school, recently underwent a significant transformation with a rebuilt and upgraded infrastructure by Lloyd Constructions. This tender was released for numerous companies and KUGA won through a competitive tender for building 100kW solar PV system using 450W Risen Solar panels
The Solution
KUGA successfully delivered the 100kW solar PV system on Block G of Corrimal High School, meeting both the project timelines and the specifications set by the NSW Department of Education. The system’s impressive metrics include an annual solar generation of 126.531MWh and carbon dioxide savings of 126.02 tonnes, showcasing the project team’s resilience and adaptability.